No Nama Peserta K SK SB B A T ST P PT HN H SH SA P PK Alasan
1 CV. BERKAH TEKNIK CONSULTANT - 75.335.932.2-723.000 60,0 60,0 72,48 Rp. 105.148.000,00
Rp. 105.148.000,00
100,0 77,98
2 CV.FAQIH ENGINEER KONSULTAN - 94.278.484.4-723.000 100,0 100,0 76,0 Rp. 118.259.400,00
Rp. 118.259.400,00
Rp. 118.259.400,00 89,0 78,58
3 CV. A-di Cipta Consultant - 71.561.200.8-723.000 80,0 80,0
4 CV. HENINDO KONSULTAN - 66.013.897.5-723.000 100,0 100,0
5 CV.Borneo Engineering Consultant - 73.199.188.1-723.000 100,0 100,0
6 CV. ARCHIPLAN DESIGN - 93.632.713.9-805.000 40,0 Skor Kualifikasi tidak memenuhi ambang batas
7 NAVEEDKONSULTANDESIGN - 82.181.847.3-802.000 100,0 100,0
8 CV.GRAHA MITRA NUSANTARA Konsultan - 72.335.168.0-723.000 100,0 100,0
9 CV. 99 ENGINEERING - 02.652.170.8-723.000
10 CV. MUFID CONSULINDO - 66.110.663.3-727.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • B Pembuktian Kualifikasi
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak