No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. BERKAH TEKNIK CONSULTANT - 75.335.932.2-723.000 | 60,0 | 60,0 | 72,48 | Rp. 105.148.000,00 |
Rp. 105.148.000,00 |
100,0 | 77,98 | |||||||||
2 | CV.FAQIH ENGINEER KONSULTAN - 94.278.484.4-723.000 | 100,0 | 100,0 | 76,0 | Rp. 118.259.400,00 |
Rp. 118.259.400,00 |
Rp. 118.259.400,00 | 89,0 | 78,58 | ||||||||
3 | CV. A-di Cipta Consultant - 71.561.200.8-723.000 | 80,0 | 80,0 | ||||||||||||||
4 | CV. HENINDO KONSULTAN - 66.013.897.5-723.000 | 100,0 | 100,0 | ||||||||||||||
5 | CV.Borneo Engineering Consultant - 73.199.188.1-723.000 | 100,0 | 100,0 | ||||||||||||||
6 | CV. ARCHIPLAN DESIGN - 93.632.713.9-805.000 | 40,0 | Skor Kualifikasi tidak memenuhi ambang batas | ||||||||||||||
7 | NAVEEDKONSULTANDESIGN - 82.181.847.3-802.000 | 100,0 | 100,0 | ||||||||||||||
8 | CV.GRAHA MITRA NUSANTARA Konsultan - 72.335.168.0-723.000 | 100,0 | 100,0 | ||||||||||||||
9 | CV. 99 ENGINEERING - 02.652.170.8-723.000 | ||||||||||||||||
10 | CV. MUFID CONSULINDO - 66.110.663.3-727.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak